Skip to content

BIM Design & Coordination

Coordinated BIM models that catch clashes before construction and drive 4D/5D quantities and schedules, cutting cost.

  • Clash detection
  • 4D / 5D

We build a coordinated BIM model across architecture, structure and MEP, detect and resolve clashes before construction, and take quantities and schedules straight from the model (4D/5D).

Who is this service for?

Owners and contractors alike, including small and mid-size projects. Model size and level of detail are set per project; the goal is always fewer clashes and less waste.

What you gain from BIM

  • Clash detection: reports that catch problems before they reach site.
  • Quantities (5D): quantities taken from the model.
  • Sequencing (4D): a time-based simulation of construction.
  • Operation and maintenance: an as-built model that supports asset information.

The result

Less waste, fewer change orders and faster decisions on site. The model also supports quantity surveying, project management and shop drawings.

Ready to start your project?

Send your project details on WhatsApp and a specialist engineer will reply.