Building Permits & AOR
Building permits and approvals followed through with authorities, including the Architect of Record (AOR) letter.
- Building permits
- AOR letter
We prepare, submit and follow up building permit and approval documents with the authorities until they are issued, including the Architect of Record (AOR) letter, and make sure the design complies with local codes and regulations.
Why do you need an engineering office for a building permit?
A building permit application in Saudi Arabia starts on the Balady platform and requires an engineering office to prepare the designs and the permit file before the municipality reviews and approves it. Because requirements can vary by project type and location, a strong file from the start is what reduces comments and delays.
How we handle your permit
- File preparation: we prepare the drawings and documents the project needs.
- Double internal review: we check the drawings against requirements before submission.
- Submission and follow-up: we submit the application and follow it with the authorities.
- Responding to comments: we resolve authority comments until approval.
Do you have an existing building?
If your building does not match its permit or the permit needs amending, see survey and building adjustments. If you have no design yet, start with architectural and structural design.
Ready to start your project?
Send your project details on WhatsApp and a specialist engineer will reply.
